| Static Pile Load Test |
Dynamic load test on Bored Pile. |
| |
|
 |
 |
| Determination of pile length under existing structure |
Pile integrity test |
| |
|
 |
 |
| Strain gauges fixed to re bar |
Connect re bar to steel cage of bored pile |
| |
|
 |
 |
| Pile after instrumentation. |
Connect all cable to switching box. |
| |
|
 |
 |
| Load cell placement on hydraulic jacks. |
Load cell placement on hydraulic jacks. |
| |
|
 |
 |
| Sonic logging(Coring) preparation |
Sonic logging monitoring |
| |
|
 |
 |
| Sonic logging recording |
Inclinometer monitoring . |
| |
|
 |
 |
| Measurement of pile lateral movement by inclinometer during lateral load test. |
Dril l hole monitoring |
| |
|
 |
 |
| Drill hole monitoring recording |
Electric dutch cone penetration at work. |
| |
|
 |
 |
| Electric dutch cone penetration at work. |
Soil boring by rotarymachine. |
| |
|
 |
 |
| Concrete compression test |
Concrete compression test |
| |
|
 |
 |
| Survey work |
Survey work |
| |
|
 |
 |
| Secant pile wall monitoring |
Diaphargm wall monitoring |
| |
|